This is a time-lapse video of the installation of a System 3EZ cyclorama being installed in the Adrenaline Films production facility. Thanks to Tim at Adrenaline Films for providing this great footage which is actually hundreds of photos taken 60 seconds apart and then stitched together to form this footage.
As you watch you will notice how Pro Cyc systems are assembled by first joining the modular pieces together for each straight section, then simply tipped into place and fastened to the wall and floor. This cyc wall which is used for both greenscreen and as an infinity background was installed in less than a day. But it can just as easily be used for blue screen as a virtual set. All that remained to do after the cove pieces were installed was to mud and sand the seams and then paint for a perfect seamless background.